Construction Developments

Pre-Application Assessment

A Safeguarding pre-application assessment will be conducted to determine whether a feasibility study is required. This includes a virtual conference call to discuss the development in detail regarding the assessment, as well as setting timescales required by the developer.

Image by Nikola Johnny Mirkovic

Crane Permits 

Airport Impact Assessment (AIA)

An assessment on a proposed crane operation will be conducted. This will Includes an

 

  • Airport ADQ-IR assessment

  • Obstacle Assessment

  • Crane Permit Application submission

  • IFP assessment.

 

This will enable the developer to operate a crane with legal consent by the airport.

 

 

Benefits to you:
 

  • Avoid a £700 airport fine

  • Maintain a positive company reputation with the safe operation on your construction site

  • Avoid any delays in permit submission

  • Avoid additional costs for delays

Image by Troy Mortier

Site Management

Airport Impact Assessment (AIA)

An assessment of the site compound to ensure the following:

 

  • Waste procedure

  • Foreign Object Debris (FOD)

  • Bird Management

  • Construction Lighting


​This will enable the construction company to have a safe operating compound near an airport.

Benefits to you:

  • Avoid a £700 airport fine

  • Maintain a positive company reputation with the safe operation on your construction site.

Image by Bertrand Bouchez

Drones
 
Airport Impact Assessment (AIA)

An Airport Safeguarding assessment to determine if the location of a drone is within an airport restricted area. This also includes:

 

  • Identifying the weight and class of the drone

  • Requirements for becoming a registered drone operator

  • CAA drone training.

  • Licences needed to fly in the chosen location

 

Benefits to you:

  • Avoid legal action by the poilce, this includes a fine and potential prison time.

  • ​Avoid any delays to your operation